Certified Data Center Design Professional (CDCDP®)
Create a comprehensive data center design that supports the critical needs of the business, examining in-depth the key constraints of data center functionality to deliver a balanced, efficient and sustainable solution.
Visão geral do programa
The Certified Data Center Design Professional (CDCDP®) program is proven to be an essential certification for individuals wishing to demonstrate their technical knowledge of data center architecture and component operating conditions.
This five-day program has a comprehensive agenda that explores and addresses the key elements associated with designing a data center. It teaches best practice principles for the design, construction
and operation of computer rooms and data center operational support facilities. The program also
addresses the importance of accurate interpretation of detailed customer requirements at the planning stage to ensure that the business needs remain focal to all decision making.
Learners will also explore the key elements of physical infrastructure, electrical distribution systems, air-conditioning, data cabling and building support systems. The program concludes with a comprehensive case study exercise that guides learners through the design steps from initiation to commission, covering the business decisions, design scope and implementation phases that need to be addressed throughout all aspects of the process.
A certified CDCDP® also considers the requirements for compliance, having a full understanding of national and international regulations, codes and standards. During the program, learners will be provided a valuable opportunity to access the latest industry standards.
The CDCDP® program is led by one of CNet’s expert Instructors and is available via remote attendance or classroom-based.
Request Follow-Up
Certified Data Center Design Professional (CDCDP®) Program Details
What is a Data Center?
- The data center stack
- Types of data center
The Design Planning Process
- Main design considerations
- Developing a project plan
Scoping the Requirement
- Identifying key stakeholders
- Market and political drivers
- National and international standards
- Availability and resilience classifications
- Introduction to Availability Models (Uptime Tier, TIA 942-B Rating, BICSI Classes & Syska Hennessy Critical Levels)
- Recommendations for location, size, heights, floor loading, lighting and décor
Whitespace Floor
- National and international standards
- Structural and load requirements
- Recommended floor heights
- Airflow and sealing
- Ramps and access
- Seismic protection
- Slab floor construction considerations
Cabinets
- Requirements of a cabinet
- Security, safety and stabilization
- Clearance, accessibility and ventilation
- Cable management
- Seismic stability considerations
- Design specifications
Power
- Regulations and codes
- The meaning of N, N+1 2(N+1), etc
- Power delivery and distribution losses
- Uninterruptible Power Supply (UPS) options
- Generator considerations
- Power distribution units
- Power distribution to, and in a rack
- Remote Power Panels (RPPs)
- Emergency Power Off (EPO)
- Estimating power requirements
Cooling
- National and international standards
- Basics of air conditioning principles
- CRAHs and CRACs
- ASHRAE Operational parameters
- Under floor plenum approach
- Hot aisle/cold aisle layout principle
- Hot and cold aisle containment
- Psychrometric charts
- Min and max throw distances for under floor air
- Bypass and recirculation
- Gerenciamento de fluxo de ar
- Chilled water racks, CO2, free air cooling
Earthing & Bonding
- Applicable standards
- The terminology of earthing, grounding & bonding
- Equipotential bonding
- Electrostatic Discharge (ESD)
- Functional earths
- The Signal Reference Grid (SRG)
Cable Containment, Management & Protection
- Applicable standards
- Separation of power and data cables
- Administration and labelling
- Types of conduit, trunking, tray, etc, available
- Earthing and bonding
- Containment fill ratio
- Underfloor v overhead containment
- Cable management, in and to a rack
- Fire stopping
Delivering the IT Strategy
- Data center equipment
- Functions and protocols, current and future
- Data center connections
- Cabling requirements
- Cabling standards
- Cabling options
- The impact of 40G and 100G
- The impact of virtualization
Copper and Optical Fiber Cabling Connectivity
- Cabling standards
- Cable standards, 10GBASE-T, CAT6A & Cat 7A & Cat 8
- Screened vs unscreened cables
- High density patching
- Alien crosstalk
- Copper test requirements
- Design for growth management
- Channel connections
- Connection topologies
- Optical connectors, past and present
- Optical fiber management
- Types of optical cable
- Pre-terminated cabling
- Advantages/disadvantages of pre-terminating cables
- Optical component loss and link power budgets
- Application link loss
- Optical testing requirements
- Pre-terminated cabling
Safety and Manageability
- Local codes and regulations
- Fire safety plan
- ASD and detection systems
- Fire suppression systems
- Fire safety cable requirements
- Security and access control
Commission and handover
- Benefits of commissioning
- Commission process and test sequence
- Handover process and training
- Lessons learned
Power Review
- Power consumption trends
- Energy availability, security and cost
- Energy challenges facing the data center
Power Regulations
- Which regulations affect data centers?
- Environmental regulations and pressures
- Energy and environmental programs
Power Basics
- Ohm’s law, Joule’s law, the Kirchhoff laws
- Electrical parameters
- AC and DC
- Single phase and three phase
- Residual currents
- Harmonics
Power to the Data Center
- Where does the electricity come from?
- Electrical supply options
- Transformers
- Surge suppression devices
- Costs of electrical power
- Types of tariff available
- Alternate power supply options
Distribution in the Data Center
- Electrical circuit requirements
- Switching devices
- Power factor correction units
- Automatic and static transfer switches
- Main, feeder, sub-main circuits
- Power distribution units
- Remote power panels
- Final circuits
- Cable and fuse sizing
- Power distribution and associated losses
- TN-S systems
- Energy efficiency
Standby Power
- UPS components, batteries and redundant systems
- UPS options and considerations
- Static and maintenance bypasses
- Standby generators
Cooling Review
- Data Center limiting factors
- Sources of cooling inefficiencies
- Cooling trends
Regulatory Climate
- Which regulations affect data centers?
- Environmental pressures
- Cooling efficiency
- Design considerations & planning redundancy
- Overview of Computational Fluid Dynamics (CFD)
- Periodic review process
Environmental Parameters
- Standards, NEBS, ETSI, ASHRAE
- Operating environment ranges
- Rate of change
- ASHRAE psychrometric charts
- Humidification systems
- The need for sensors
- Measuring and monitoring
Collecting the Heat
- Cooling system overview
- CRACs and CRAHs
- Maximizing existing investment
- Rack v row options
- Dynamics and problems of air flow
- Liquid cooling
- Comparison of high-density cooling
- Available cooling options
Heat Rejection Or Reuse
- Heat transfer considerations
- DX systems
- Chilled water CRAHs
- Chiller options
- Adiabatic cooling
- CWS and CHWS plant
- Design considerations
- Free cooling and free – air cooling
- Commissioning maintenance
- Planned preventative maintenance
Energy Use Systems
- Energy efficiency issues
- Layers of inefficiency
- Power system provision
- Cooling system provision
- Understanding areas of improvements
IT Infrastructure
- Extending the operating envelope
- Environment zones
- Accurate IT calculations
- Energy use in the IT equipment
- Software and storage considerations
- Transformation options
- Energy efficient IT equipment
Power Systems
- Energy use in the data center
- DC power train
- Matching the support to the IT load
- Transformer efficiencies
- UPS & motor efficiencies
- DCiE for modular provisioning
- Maximizing the power factor
- Measuring and monitoring
- Infrared inspections
- Planned electrical safety inspections
- Implementing data center electrical efficiency
Cooling Efficiency
- Cooling, a cascade system
- Affinity laws and cooling equation
- CRAC and CRAH efficiencies
- Optimizing air-side systems & water-side systems
- DCiE for cooling options
- Diagnostic and site specific monitoring
- Design considerations
Data Center Metrics
- Where and what can we measure?
- The metric stack
- Metric characteristics
- Current industry metrics (PUE, CUE, WUE, ERE, RCI & RTI)
- Chained value metrics (CADE)
- Proxy metrics (FVER, DPPE, DCeP)
Efficiency Models & Best Practices
- Energy calculations
- Levels of modelling
- Modelling tools
- Sources of guidance
- Effective v Efficient
- The DC language barrier
- the multi-functional team
- Design for efficiency, operability & flexibility
- Industry recognized best practices
Design Management
- Characteristics of project management
- Key project processes
- Identifying and engaging with key stakeholders
- Setting goals
- Prioritization of activities
- Cornerstones of project management
Managing the Design Process
- What is to be delivered?
- What constraints are there?
- Managing dependencies
- Managing the tribes
- Managing conflict
- Identifying risk
- Risk and issue management
- Change management
- Reporting and communication
Managing the Design Implementation Process
- Project charter and specification
- Risk assessment and management
- Scope management
- Float and critical path
- Human resource management
- Project integration and work breakdown structure
- Time and cost management
- Handover and progressive acceptance